Acta Aquitaine - Hydroelectric investment

Acta Power
Issuer's Country Flag France

Acta Aquitaine - Hydroelectric investment

Acta Power
Issuer's Country Flag France

Join the revival of 3 hydroelectric power plants in France

The Acta Aquitaine project, developed by Acta Power, involves acquiring and rehabilitating 3 run-of-the-river hydroelectric power plants , located in Dordogne and Charente.


This portfolio contributes to the deployment of low-carbon energy and energy sovereignty. 5.2 GWh of clean electricity will be produced each year, equivalent to the consumption (excluding heating) of more than 2,300 people *.


For this operation, Acta Power is seeking to raise 2,000,000 € in a single tranche .

The 3 power plants, already in operation, have secured new electricity purchase contracts in exchange for renovation and performance improvement work to enhance their performance .




*Annual electricity consumption of a household excluding heating: 4,792 kWh ( Ademe ), 2.15 people per household ( Insee )

Moulin de Mattard

Moulin de Mattard © Acta Power

The offer

Details and characteristics of the offer

Acta Power is a French company that offers an investment opportunity in the financing of 3 hydroelectric plants located in Dordogne and Charente, grouped within the company Acta Aquitaine.

OBJECTIVE

The crowdfunding operation of Acta Aquitaine aims to raise up to 2,000,000 euros .

USE OF FUNDS

These funds will be used by the project holder to finance the acquisition of 3 hydroelectric plants .

REPAYMENT

The repayment of the bonds will take place through long-term refinancing .

SECURITY

Investors benefit from a first-ranking pledge on the securities account of the issuing company .

TAX SAVING MEASURE

The project is eligible for the PEA PME . If you wish more information, visit our blog article l’Empreinte and our video on Youtube on this subject.

organigramme acta aquitaine

Specifications

Tax exemption options
PEA-PME
Min investment
€50
Raised amount
€2,000,000
Unit value
€10
Interest payment
annualized
Participatory funding rankings
See documentation

Investment phases

Starting Wednesday 19 November 2025 12h30
  • Investment open to everyone
Until Friday 19 December 2025 23h59

End of project financing

Resources

Documents Annexes Risks

Simulator

If I had invested

|

Investment simulation
Acta Aquitaine - Obligation 8%/year over 3 years - PEA-PME
Simulation - Rate : 8% / year on 3 ans

Initial investment:

€5,000

Repayments and interest:

€6,200

In 3 transfers

Date Interest* Capital Amount
31/12/2026 €400 €0 €400
31/12/2027 €400 €0 €400
31/12/2028 €400 €5,000 €5,400
Total €1,200 €5,000 €6,200

The result presented is not a forecast of the future performance of your investments. It is only intended to illustrate the mechanics of your investment over the investment period. The evolution of the value of your investment may vary from what is shown, either increasing or decreasing.




The project

What will your investment fund?

🧬 The genesis

Acta Power began its activity by developing software for identifying suitable sites for the installation of hydroelectric power stations and for modelling water flows. With this experience and the company’s internal expertise, Acta Power aims to become an electricity producer, primarily through the acquisition of existing hydroelectric power stations .

Three run-of-river hydroelectric power stations in Dordogne and Charente have been identified to start operations.


illustration Acta Aquitaine

💧 Technology: hydroelectric power

Hydropower is the leading source of renewable electricity in France (and the second largest low-carbon source after nuclear), accounting for nearly 14% of the electricity mix in 2014 ( RTE ).

In 2023, hydroelectric power represented an installed capacity of 25,864 MW ( France Hydro Électricité ). It is broken down into more than 2,500 facilities distributed by power as follows:

  • Step-through power stations 26%
  • Sluice-type power stations 16%
  • Reservoir power stations 40%
  • STEP: pumped storage power station 18%

    >
💡 Did you know?

Run-of-river power stations are located along the course of rivers. There is no water retention and electricity is produced in real time, with no storage capacity, unlike dams. Run-of-river power stations have little or no capacity to modulate their production according to demand, and their output varies greatly depending on climatic events (rainfall, droughts, seasons, etc.).

On the other hand, they only require simple and less expensive installations than those of higher-power plants. Therefore, their production cost is lower, which compensates for the lower service provided.


illustration Acta Aquitaine

🌊 Power stations

Acta Power, through its subsidiary Acta Aquitaine, will acquire, in whole or in part, three wind turbines with a total installed capacity of 1,000 kW .

! illustration Acta Aquitaine

| Project name | Ménesplet Mill | Mattard Mill | Mauriac Mill | | — | — | — | — | Department Dordogne Charente Dordogne | Exploited watercourse | L’Isle | La Charente | L’Isle | | Power before works | 698 kW | 360 kW | 80 kW | | Power after the works | 652 kW | 374 kW | 245 kW | | ** CAPEX 2 000 k€ 1 715 k€ 1 275 k€ | Electricity sales contract | EDF H16 bis & PPA LLUM | EDF H16 bis | EDF H16 bis |

New 20-year H16 Bis2 purchase obligation contracts have been secured with EDF Obligation d’Achat (EDF OA). In order to benefit from an attractive tariff that will more than double its current turnover (CA), Acta Power will have to carry out refurbishment work on the hydroelectric power stations.

illustration Acta Aquitaine



>

🚧 Rehabilitation works

In exchange for the rates guaranteed under the purchase obligation contracts, work must be carried out to replace the main components of the power stations (turbines, generators, control systems, etc.). The previous owners do not wish to finance these investments, and Acta Power has taken advantage of this opportunity to acquire the three power stations.

Molinos Ménesplet Mattard Mauriac | — | — | — | — | | Planned works | replacement of turbines 2 and 3 with two 200 kW Kaplan units | replacement of the four units with three 160 kW Kaplan turbines | replacement of the two units with Kaplan turbines |

Firstly, Acta Power will complete the purchase of shares and take control of the companies Moulins de Ménesplet, Mauriac and Mattard at the end of 2025. Renovation work will begin in the summer of 2027, as the manufacturing period for the turbines is approximately one year.

>

⚡️ Electricity resale


EDF Contract H16 bis

All new installations will sell their electricity through an EDF H16 bis purchase obligation contract .


PPA TODAY

The facilities preserved in their current state will sell their electricity through a Power Purchase Agreement (PPA) to LLUM , a French green electricity supplier based in the Eastern Pyrenees.


Impact

What positive impact will your investment have?
Installed capacity
1.125 MWp
Annual production
5230 MWh
Equivalent power consumption
More than 2346

Project owners

Who will implement the project?
Acta Power
Issuer's Country Flag France

🌊 Experts in Hydropower Project Development

Founded in 2022, Acta Power specializes in the development of renewable energy projects, particularly hydropower. Positioned across all phases of projects, from development to operation, the company focuses on solutions best integrated into their environment.

Carried by 4 partners with over 65 years of combined experience in energy and hydropower, Acta Power has developed several services that it offers to different actors in the hydropower sector in Europe.

Screening

Cross-analysis of numerous geographical data sources to compile inventories of sites with high renewable energy potential (gravitational hydropower, pumped-storage, or photovoltaic projects)

Hydrological Modeling

1. Watercourse Flow

The team from French public research develops modeling tools based on the latest work from INRAE, to reconstruct past flows and predict future flows of watercourses.

2. Impact of Climate Change

In collaboration with the Laboratory of Climate and Environmental Sciences (LSCE), Acta Power analyzes the expected impacts of climate change on hydrology to ensure the sustainability of projects.

3. Evaporation of Water Bodies

Based on the FLake model, Acta Power's simulations allow for reliable, rapid, and cost-effective evaluation of water loss due to evaporation across various water bodies.

Read More Read Less

Our analysis

What are the risks and proposed mitigation measures?
Download our full analysis

Risk overview

Construction risks

CAPEX increase

Risk of higher construction costs due to rising raw material prices

Mitigation methods

Les 3 centrales à remettre à niveau sont aujourd’hui déjà en exploitation. En conséquence, les travaux de génie civil, de raccordement, et de construction de bâtiment seront superficiels. La majeure partie de la main d’œuvre aura pour objet de remplacer les turbines, et de remettre à neuf la machinerie des moulins. De surcroît, la part de la main d’œuvre dans les CAPEX est assez réduite. Et avec les devis des turbines Kaplan pour chaque centrale reçus, les risques d’augmentation de CAPEX sont mesurés.

Refinancing risk

Refinancing

Credit risk related to the company's ability to refinance and meet its debt obligations.

Mitigation methods

Les flux opérationnels tirés de la vente d’électricité au tarif d’achat sécurisé sont prévus pour début 2028. D’ici là, l’activité des centrales ne pourra pas dégager de trésorerie suffisante pour rembourser le capital de la dette Total Energies Invest. Le remboursement aura donc pour origine un refinancement via un fonds d’investissement ou une nouvelle levée obligataire participative. Ce risque est atténué grâce au profil des travaux à réaliser. En effet, ayant affaire à des centrales en exploitation, elles disposent chacune de structures déjà établies, limitant ainsi l’objet de la main d’œuvre au remplacement des turbines, et à l’adaptation des machines et du réseau de distribution à celles-ci.

Operating risks

Bad operation

Risk of poor project operation, faulty workmanship or machine breakdown resulting in poor performance.

Mitigation methods

La structure Acta Power en elle-même ne possède pas de track record concernant la gestion de projet de ce type. Il présente, sans trésorerie solide, un risque fiancier. Cependant, les associés ayant fondé Acta Power possèdent une expérience réussie en tant que manager d’équipe chargée de financer, développer, construire et exploiter des centrales hydroélectriques de petits comme de gros calibres. Bien que les centrales disposent de contrats d’achat d’électricité, elles ne seront pas en activité lors des opérations de remises à niveau. Pour pallier ce risque, le financement Total Energies Invest a été structuré afin d’offrir un matelas de liquidités suffisant, dans l’attente du financement bancaire, également dimensionné pour proposer une marge de liquidité confortable.

Operating risks

Technology

Technological risk that the system will not perform as expected, or that performance will degrade more rapidly than anticipated.

Mitigation methods

La technologie choisie (Kaplan) pour ce projet fait référence dans le secteur hydroélectrique. Les équipes réalisant la maintenance des centrales sont déjà constituées et assureront la continuité de l’activité. De plus, Acta Power, via ses associés, possède également en interne les compétences nécessaires afin d’assurer la maintenance des centrales.

Investing in this participatory financing project involves risks, including the risk of total or partial loss of the capital invested. Your investment is not covered by the deposit guarantee schemes established in accordance with directive 2014/49/EU of the European Parliament and of the Council . Your investment is also not covered by the investor compensation schemes established in accordance with Directive 97/9/EC of the European Parliament and of the Council . Return on investment is not guaranteed. This is not a savings product, and we recommend that you not to invest more than 10% of your net assets in participatory finance projects. You may not be able to sell the investment instruments when you wish. If you are able to sell them, however, you may incur losses.